Electrical
Hangar D power and plumbing, Tullahoma Regional Airport
New electrical service and distribution plus plumbing and sewer rough-in for an existing hangar on Taxiway Lane at Tullahoma Regional Airport — trenched, wired, and plumbed by the same crew.

Existing hangars need work too. This hangar on Taxiway Lane, a few doors from Horst Co’s own base at Tullahoma Regional Airport, needed new power and plumbing without shutting the tenant down.
Two trades, one trench
The electrical service and the sewer line share the same excavation, which is exactly why doing both in-house matters: one crew trenched, set, inspected, and backfilled, and the distribution panels and plumbing rough-in went in together on a schedule the tenant could plan around.





